Welding Area TODO
Current items are in the old style, on https://www.i3detroit.org/wiki/Category:Welding_Area#Wishlist_and_Tasks
Could really use some help getting updated to the new style.....
General TODOs
Task Name | Description | Priority | Champion |
---|
Equipment TODOs
TODO | |
---|---|
Bench-Mounted Manual Metal Shear | Add a spring loaded hold down to the left (anvil) side |
CNC Plasma Cutter | 1) Install permanent air drop for the machine, check air humidity/oil/etc.
2) Install permanent power for the CNC side of the machine 3) Clean out the water table 4) Seal water table leaks 5) Install limit switches (included with purchase, not currently installed) 6) Develop class content for training 7) Inventory consumables for the plasma cutter 8) Determine per-minute rate for using the machine 9) Put together instructions on swapping to the hand torch on the plasma cutter for hand work 10) Create signs for Down/Training/Etc |
Hossfeld 2 Universal bender |
|
Synchrowave 350 LX |
|
Welding Table | Replace with a proper layout table and a flat welding table w/ threaded anchor holes. Maybe a downdraft table too. 4x8 for the layout table, a couple of 4x4 welding tables that can be clamped together, 3x4 for the downdraft, ideally 3 of them, each with their own set of practice welders. |