PotLock 2024-01-27: At Least Sewing Zone is Building Something Edition

From i3Detroit
Jump to: navigation, search

Food Planning

Please sign up to bring some food!

  • Beverages will be BYOB.
  • There is a grill at the space!
  • If you have a crockpot, please consider using it! We don't have proper kitchen at the space (yet!), so crockpots and such will be helpful for supplying us all with hot food.
 * (I can bring a slow-cooker/buffet warmer with three pots, if asked. - Matt A
  • Please create a label with ingredients so that we can be mindful of food restrictions

Entrées =

  • White Chicken Chili -- Lauren Yellen

Snacks, Salads, & Sides

  • Cliff Bars -- DaveS

Desserts

  • Harry Potter candy bars -- JanH

Tasklists

My Zone

Tasks

  • Attention Zone Coordinators:
    • Copy and paste this section from the line that says "My Zone" to the line that says "END"
    • Change "My Zone" to your zone's name
    • Change this list to the tasks/projects you want

Supplies Needed

  • Make a shopping list for your tasks here
  • END


Sewing Zone buildout

Tasks

    • Electrical work
    • Mudding prep (make sure drywall screws are flush)

Supplies Needed

  • Make a shopping list for your tasks here
  • END

General space tasks/Infrastructure

Tasks

    • Paper towel/bath tissue shelves in A
    • Is this where we're storing paper products?
    • Remove non-paper stuff/clutter and store paper towels/tissue according to labels on unit, if it stays
    • There's a non-working light fixture behind Wolverine in the Laser Zone. Does the unit control need replacing?
    • For zones and storage areas without walls, mark floor with yellow paint border, from floor plan (ie LPS, Tool Crib, CNC, Machine Shop, Jewelry, Ceramics
    • If necessary, mark areas to keep clear
    • label storage with locations around i3 to communicate with members why we have what we have
    • check carbon monoxide vent on b-side furnace
    • Create big labels and stock first aid bins with bandaids/upgrades

Supplies Needed

  • Make a shopping list for your tasks here
  • bandaids
  • END

Tool Crib

Tasks

    • Mark border(s) of zone with the yellow paint
    • If the area across from Tool Crib is also Tool Crib, mark with yellow lines

Supplies Needed

  • Make a shopping list for your tasks here
  • END

Large Project Storage

Tasks

    • Identify what area is large project storage and make a sign and post it in the area
    • Paint yellow lines to mark the borders of LPS
    • Parking ticket expired/improperly stored personal property
    • Mark space property with zone it is intended for (some of the expansion purchases are stored here temporarily)
    • Update the project/property storage permits with the information that is missing -- ask a new member? because it's confusing and people are getting it wrong


Supplies Needed

  • human help
  • scavenge wood to paint a sign or make a poster with large format
  • END

Member Storage

Tasks

    • identify plots held by departed members
    • clear abandoned plots
    • update labels
    • update CRM

Supplies Needed

  • Make a shopping list for your tasks here
  • END

Craft zone buildout

Tasks

    • Move construction materials to the open space/future elab space (might need some table moves first)
    • sweep/vacuum/dust
    • Paint yellow zone border lines to mark zone space; or, mark with stanchions (currently stored in loft)
    • Run planned electrical: east wall, and drops
    • Build partial wall on south end
    • Assemble shelving/etc that acts as west border of zone
    • Move Vinyl Zone into space planned for it within zone layout


Supplies Needed

  • human stuff movers, cleaners, builders
  • yellow paint (see paint zone)
  • building materials (see Kevin)
    • 2x4s: Sufficient to frame a 14'7"-long half wall (height approx. 30 inches, adjust to materials)
    • For wall placement, see File:CraftRoomLayout.pdf .
    • Everything except the length of the wall is builder's choice, and even that is negotiable. Adjust as needed.
  • END

Ceramics Zone

Tasks

  • Install shower curtains around wheel to keep the space cleaner
  • A brake for the large motorized wheel.
  • Move ceramics cabinet to cabinet wall. This is the wall where the wood shop's cabinet is.

Supplies Needed

  • Brake making components
  • Shower curtains to contain splashes of clay into jewelry zone
  • Hardware/maybe small curved pipes for installation of shower curtains

Glass Zone

Tasks

  • Clean and organize glass zone equipment to ready for move


Supplies Needed

  • Cleaning gloves

Leather Zone

Tasks

  • fix the light on ceiling behind wolverine -- INFRASTRUCTURE
  • Move R2D2 (nitro machine) and freezer?


Supplies Needed

  • Human capital

Commons

Tasks

  • Lubricate Genie


Supplies Needed

  • Lubrication


Jewelry Zone

Tasks

  • A new exhaust vent for the casting area; attached to kiln (48")
  • Repair the metal drawer below the enameling kiln
  • Build tool hanger wall on back of table (2-post, from ground; like a mini tool crib; pegboard, or leather tool-holder slots)

Supplies Needed

  • Exhaust vent hood (48") (fabricate)
  • Exhaust vent pipe (8"?) (purchase)
  • Exhaust inline fan (8"?) (purchase)
  • Exhaust conduit support arms (8"?) (fab)


  • END