PotLock 2019-05-11: Strive for the CoO Edition Tasklist

From i3Detroit
Jump to: navigation, search

PotLock: Strive for the CoO Edition (May 11, 2019) Tasklists

Tasklists

Certificate of occupancy tasks

  • North panel two wires on different phases sharing a common
    • Mark will combine the circuits
  • Move lights closer to the outlets and shorten cords
  • Clean Bathroom
  • Clean drain in the back
  • Sure seal installation
    • Might be done already?
  • install thermostat from Roger
  • cover up all open electrical boxes/panels
  • install new exterior lights


Other West Wing Stuff

  • clean and repaint sewer vents
  • clean all windows inside and out
  • rake behind the building
  • Hang second medicine cabinet next to the mirror in the bathroom
  • label all breaker panels with a name/number/greek letter/some cardinal naming convention
    • label all outlets and switches with the panel and breaker they are serviced by

Supplies Needed

  • 36 sheets of type x drywall
  • 61 metal studs
  • 253 feet of header/footer for metal studs
  • 10 tubes of fire caulk
  • 5 cans of fire expanding foam
  • glass cleaner
  • exterior white paint
  • thermostat from roger
  • END

Welding Zone

Tasks

  • Organize under-table scrap
    • Sort by ferrous (magnetic) and non
    • Put small-but-usable bits in labeled buckets
    • Cut up large pieces that are mostly empty space
    • Pitch unusable bits
  • Move and sweep/vacuum behind all tables/tools/screens

Supplies Needed

  • Buckets for sorting under-table scrap
  • END