Potlock 2019-02-23: Growing Pains Edition
Contents
PotLock: Growing Pains Edition (February 23, 2019) Tasklists
Tasklists
Expansion Zone
Note: GET PICTURES! We need pictures for fundraising and history, especially grungy-ass "before" pics!
Tasks
- replace pushmatic breaker 8A in wood shop panel with one from back stock
- Remove only the broken glass from dividing wall (Frank will be taking the frames and unbroken panes later for an art project
- Emergency exit lights do not work
- Remove gauge on treehouse with broken glass
- Replace wood flooring in office overhead
- Fix outlet hanging by wires
- Replace missing acoustic tiles in office area
- Remove PVC pipes through wall and fill with expanding foam
- Remove all unused water pipes from i3 (A mezzanine, wood shop, B back wall, B over power inlet)
- Remove rod stock from B ceiling
- Re-key front, back, and middle doors on B side to comply with side door that we and the landlord have keys to
- Re-key mailbox on B side
- Remove mailbox on A side and make a sign to point mail carrier to B side
- Repair wiring to doorbell on B side
- Run network to B side
- Close up hole between Mezzanines
- Remove "intercom" boxes and wiring from B side
- Re-paint keepouts on A side around breaker panels
- Paint keepouts on B side around breaker panels
- Trace all light switches, outlets, and breaker panels on B side and label them
- Trace all light switches, outlets, and breaker panels on A side and label them
- Run cabling and set up security cameras for B side
- Remove and cover over bladeless ceiling fans on B side
- Add colored rolling trash can for Deposit only glass
- Investigate issue with network jacks on e-lab/craft room wall
- Investigate outlets on e-lab/craft room wall
- Hoist down and diagnose fan motor in machine shop (wall exhaust fan)
- Re-fit all light fixtures on B side using only available parts (no purchase of tubes, ballasts, or fluorescent fixtures will be reimbursed under any circumstances), discard broken ones.
- Fill gaps between our side and landlord's section of the building
- Determine how to meter landlord's power and gas consumption
- Uncover ceiling vent fan and assess (cover back up after because it's winter)
- Move lights either above the gantry crane's path or otherwise out of the path
- Clean bathroom on B side
- Clean all windows
- Remove vinyl from doors
- Reinstall front parking barrier on B side
- Make vinyl for doors indicating hat people should enter on A side
- Gravel and re-grade behind building
- Install downspouts and secure already present ones
- Remove broken concrete and other detritus behind building
- Remove dead tree bits from rear fence
- Clean and seal around wood shop window for water ingress
- Remove, clean, and replace garage door buttons (they are very touchy)
- Take all e-waste to recycling center (bad florescent tubes included)
- Clean mold from everything
- Clean floor before painting keepouts
Supplies Needed
- Acoustic tile
- Expanding Foam
- Take lock sets to Ace for re-keying
- Key set for B side mailbox
- Bridle rings
- Floor paint
- Security cameras
- Colored rolling trash can
- Rockwool insulation for landlord wall/ceiling area
- Gravel
- Non-bendy downspouts
- Shovels and wheelbarrow to borrow
- Pruning shears to borrow
- Plywood for mezzanine
- END
My Zone
Tasks
- Attention Zone Coordinators:
- Copy and paste this section from the line that says "My Zone" to the line that says "END"
- Change "My Zone" to your zone's name
- Change this list to the tasks/projects you want
Supplies Needed
- Make a shopping list for your tasks here
- END