Elab Build

From i3Detroit
Jump to: navigation, search

This is a stub page to facilitate communication regarding the Elab build.

General Process

- Plan

- Feasibility Study

- Replan

- Feasibility Study

- Build!


General Steps

Define Floor Plan

Marking

Electrical Plan

Marking

Airflow Plan

Marking

Drywall Plan

Marking


Plan (1)

Mark elab wall height

Mark elab footprint

Mark elab doors - doors should be large enough to allow genie to go through

Mark the new heater locations (heater A-NorthNorth and heater A-NorthSouth)


Document electrical inputs and drops (electrical doc)

Document airflow requirements (airflow doc)

Framing asset calculations (sourcing-framing doc)

Drywall asset calculations (sourcing-drywall doc)


Define the result of 2x4 or 2x6 considerations for desk wall support

Define floor tile sourcing

Define the door sourcing


Feasibility Study (2)


Replan (3)


Build (4)

Relocate heaters

Door installation

Floor prep (TSP, strip, repair of relevant concrete floor surfaces)

Framing

Drywall

Mud

Sand

Paint


Party (5)

Whoo hoo!