Difference between revisions of "ToDo"

From i3Detroit
Jump to: navigation, search
Line 13: Line 13:
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| Clear Genie-width path to member storage  
 
| Clear Genie-width path to member storage  
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| Construct and affix dry-erase marker holders to every whiteboard  
 
| Construct and affix dry-erase marker holders to every whiteboard  
 
|
 
|
 
|  
 
|  
|  
+
| $0
 
|-
 
|-
 
| Collect, test, and sort all dry-erase markers and populate above holders.  
 
| Collect, test, and sort all dry-erase markers and populate above holders.  
 
|
 
|
 
|  
 
|  
|  
+
| $0
 
|-
 
|-
 
| remove MDF table/counters from wood shop  
 
| remove MDF table/counters from wood shop  
 
| ask swit to take home/remove
 
| ask swit to take home/remove
 
|
 
|
|
+
|$0
 
|-
 
|-
 
| Mount monitor on/near rack, for admin KVM usage  
 
| Mount monitor on/near rack, for admin KVM usage  
 
|
 
|
 
|  
 
|  
|  
+
| $0
 
|-
 
|-
 
| Consolidate adhesives/solvents/cleaners/etc and label <br>each&nbsp;location&nbsp;with pointers to the other locations  
 
| Consolidate adhesives/solvents/cleaners/etc and label <br>each&nbsp;location&nbsp;with pointers to the other locations  
 
|
 
|
 
|  
 
|  
|  
+
| $0
 
|-
 
|-
 
| Bring blue bins down from attic and wash them all  
 
| Bring blue bins down from attic and wash them all  
 
|  
 
|  
 
| [[User:Matt|Matt O]]
 
| [[User:Matt|Matt O]]
|
+
|$0
 
|-
 
|-
 
| Fridge cleanout  
 
| Fridge cleanout  
 
|  
 
|  
 
| [[User:Matt|Matt O]]
 
| [[User:Matt|Matt O]]
|
+
|$0
 
|-
 
|-
 
| Affix QR codes to every tool with a wiki page  
 
| Affix QR codes to every tool with a wiki page  
 
|  
 
|  
 
|
 
|
|  
+
| $0
 
|-
 
|-
 
| Cover roof openings, consider snow-melt drainage in your design  
 
| Cover roof openings, consider snow-melt drainage in your design  
 
|
 
|
 
|  
 
|  
|  
+
| $0
 
|-
 
|-
 
| Level concrete near rack  
 
| Level concrete near rack  
 
|  
 
|  
 
| Joe
 
| Joe
|
+
|$13
 
|-
 
|-
 
| Garage-door concrete  
 
| Garage-door concrete  
 
|
 
|
 
|  
 
|  
|  
+
| $4
 
|-
 
|-
 
| Winterization stuff (Bill putt suggested -- need more specifics)  
 
| Winterization stuff (Bill putt suggested -- need more specifics)  
 
|  
 
|  
 
|
 
|
|  
+
| $0
 
|-
 
|-
 
| North &amp; East Storm windows  
 
| North &amp; East Storm windows  
 
| Get measurements and figure hardware  
 
| Get measurements and figure hardware  
 
| Steve H
 
| Steve H
|
+
|$0
 
|-
 
|-
 
| consolidate and shut down small black freezer  
 
| consolidate and shut down small black freezer  
 
| Cherish
 
| Cherish
 
|
 
|
|
+
|$0
 
|-
 
|-
 
| Run air hose to bike shop/laser
 
| Run air hose to bike shop/laser
 
| run from main line and split into laser and bike area
 
| run from main line and split into laser and bike area
 
|  
 
|  
|
+
|$12
 
|-
 
|-
 
| add dividers to member storage shelves  
 
| add dividers to member storage shelves  
Line 103: Line 103:
 
| throw away junk and put all gear into bins below benches  
 
| throw away junk and put all gear into bins below benches  
 
|
 
|
|  
+
| $0
 
|-
 
|-
 
| sweep and vacuum your butt off  
 
| sweep and vacuum your butt off  
 
|  
 
|  
 
| everyone!
 
| everyone!
|
+
|$0
 
|-
 
|-
 
| identify emergency exit routes and paint the lines  
 
| identify emergency exit routes and paint the lines  
 
| we have floor marking paint, (update:picked up skinny rollers)
 
| we have floor marking paint, (update:picked up skinny rollers)
 
|  
 
|  
|  
+
| $0
 
|-
 
|-
 
| install other welding curtain  
 
| install other welding curtain  
 
| talk to Nate B. he has vision for this  
 
| talk to Nate B. he has vision for this  
 
|
 
|
|  
+
| $0
|-
+
| Fix bottom seal on garage door
+
| use quickrete to level ground
+
|
+
|
+
 
|-
 
|-
 
| make bins/shelf for welding area metal storage  
 
| make bins/shelf for welding area metal storage  
 
|  
 
|  
 
|   
 
|   
|  
+
| $0
 
|-
 
|-
 
| finish up audio system  
 
| finish up audio system  
 
| mount amplifiers in rack, mount speakers, run wire  
 
| mount amplifiers in rack, mount speakers, run wire  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| hook up outdoor light outside main door  
 
| hook up outdoor light outside main door  
 
|  
 
|  
 
|
 
|
|  
+
|$22
 
|-
 
|-
 
| mount and wire security cameras  
 
| mount and wire security cameras  
 
| talk to Joe B or Nate B about camera mount locations  
 
| talk to Joe B or Nate B about camera mount locations  
 
|  
 
|  
|
+
|?
 
|-
 
|-
 
| Make boxes to store assorted tools in tool area  
 
| Make boxes to store assorted tools in tool area  
 
| identify tools which need boxes  
 
| identify tools which need boxes  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| create a wall partition between old graveyard and CNC area  
 
| create a wall partition between old graveyard and CNC area  
 
|
 
|
 
|  
 
|  
|
+
|$26
 
|-
 
|-
 
| clean up library in loft  
 
| clean up library in loft  
 
| consolidate books down  
 
| consolidate books down  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| remove desk from whiteboard room  
 
| remove desk from whiteboard room  
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| make a bin for casters and wheels  
 
| make a bin for casters and wheels  
 
| put bin in consumables area  
 
| put bin in consumables area  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| organize fastener area  
 
| organize fastener area  
 
| organize and label fasteners  
 
| organize and label fasteners  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| build table for little sanblaster  
 
| build table for little sanblaster  
 
| talk to dustin about getting the sandblaster set up  
 
| talk to dustin about getting the sandblaster set up  
 
|  
 
|  
|
+
|$9
 
|-
 
|-
 
| clean up and organize consumables area  
 
| clean up and organize consumables area  
 
| this is the wire rack near the tool crib w/tape, switches, etc  
 
| this is the wire rack near the tool crib w/tape, switches, etc  
 
| Cherish
 
| Cherish
|
+
|$60
 
|-
 
|-
 
| Label every trash can with the size of bags it takes, and purchase bags of each size.  
 
| Label every trash can with the size of bags it takes, and purchase bags of each size.  
 
|  
 
|  
 
|
 
|
|  
+
| $25
 
|-
 
|-
 
| Wash trash cans  
 
| Wash trash cans  
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| Reroute all e-room bench equipment power cords to go behind shelf<br> (empty shelf, rip half an inch off its depth, remount it, reload it)  
 
| Reroute all e-room bench equipment power cords to go behind shelf<br> (empty shelf, rip half an inch off its depth, remount it, reload it)  
 
|  
 
|  
 
|
 
|
|  
+
|$0
 
|-
 
|-
 
| Label all E-room gear power cords (Many already done, follow example)
 
| Label all E-room gear power cords (Many already done, follow example)
 
|  
 
|  
 
|
 
|
|  
+
| $0
 
|-
 
|-
 
| Repair / upgrade selected 115V circuits  
 
| Repair / upgrade selected 115V circuits  
 
| Documentation: [[Breaker Panels]], [[Theater Lights]]
 
| Documentation: [[Breaker Panels]], [[Theater Lights]]
 
| Dave S
 
| Dave S
|
+
|???
 
|-
 
|-
 
| build a bench against the wall that will seperate woodshop from cnc area
 
| build a bench against the wall that will seperate woodshop from cnc area
 
|  
 
|  
 
|
 
|
|  
+
|$60
 
|-
 
|-
 
| seal off end of member storage shelves so that equipment can be butted against it
 
| seal off end of member storage shelves so that equipment can be butted against it
 
|  
 
|  
 
|
 
|
|  
+
| $48
 
|-
 
|-
 
|remove last row of member storage shelf against wall and move to other side of unit  
 
|remove last row of member storage shelf against wall and move to other side of unit  
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
| build shelving about FIRST area
+
| build shelving above FIRST area
 
|  
 
|  
 
| nate w/rocco
 
| nate w/rocco
|
+
|???
|-
+
|build table for other sandblaster
+
|
+
+
|
+
 
|-
 
|-
 
| make up first aid kits to place around shop
 
| make up first aid kits to place around shop
 +
| need to purchase supplies
 
|  
 
|  
|  
+
|$20
|
+
 
|-
 
|-
 
| make vinyl signage for first aid kits
 
| make vinyl signage for first aid kits
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| move cleaning cabinet to front of shop area
 
| move cleaning cabinet to front of shop area
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| allocate two of the steel drums for aluminum and steel scrap
 
| allocate two of the steel drums for aluminum and steel scrap
 +
| put vinyl signage on drums
 
|  
 
|  
|  
+
|$0
|
+
 
|-
 
|-
 
| take down the few wrenches from pegboard in metal shop
 
| take down the few wrenches from pegboard in metal shop
 
| find usefulness in the metal shop pegboard
 
| find usefulness in the metal shop pegboard
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| fix light on buffer in metal shop
 
| fix light on buffer in metal shop
 
|  
 
|  
 
|  
 
|  
|
+
|$10
 
|-
 
|-
 
| allocate a metro rack for large batteries and chargers
 
| allocate a metro rack for large batteries and chargers
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| address issues with the metal shop lighting
 
| address issues with the metal shop lighting
 
| replace some fixtures and add fixtures
 
| replace some fixtures and add fixtures
 
|  
 
|  
|
+
|$20
 
|-
 
|-
 
| organize and relocate the MDF that is stacked near the member storage
 
| organize and relocate the MDF that is stacked near the member storage
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| store unused dust collector manifold and filters in loft
 
| store unused dust collector manifold and filters in loft
 
| put filters in garbage bags
 
| put filters in garbage bags
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| collaborate with Nick/Russ on removal and dismantling of sprite chase
 
| collaborate with Nick/Russ on removal and dismantling of sprite chase
 
|  
 
|  
 
|Nick/Russ?  
 
|Nick/Russ?  
|
+
|$0
 
|-
 
|-
 
| move engine hoist to front of building by graveyard  
 
| move engine hoist to front of building by graveyard  
 
|  
 
|  
 
|
 
|
|  
+
|$0
 
|-
 
|-
 
| organize panel storage area
 
| organize panel storage area
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| make nice vinyl sign to go above panel storage area
 
| make nice vinyl sign to go above panel storage area
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| move 5sl printer away from print shop over to server area.
 
| move 5sl printer away from print shop over to server area.
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| organize vinyl cutter area.
 
| organize vinyl cutter area.
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| install 2 ceiling fans that are still in boxes.
 
| install 2 ceiling fans that are still in boxes.
 
| 1 over metal shop other?
 
| 1 over metal shop other?
 
|  
 
|  
|
+
|???
 
|-
 
|-
 
| move plasma cutter over to cleared area by kiln
 
| move plasma cutter over to cleared area by kiln
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| cleanup and organize laser cutter area. organize laser cutter stock
 
| cleanup and organize laser cutter area. organize laser cutter stock
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
|move vending machine to kitchen  
 
|move vending machine to kitchen  
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| level rough concrete
 
| level rough concrete
 
|  
 
|  
 
|  
 
|  
|
+
|$8
 
|-
 
|-
 
| make signage to identify circuit breakers
 
| make signage to identify circuit breakers
 
|  
 
|  
 
|  
 
|  
|
+
|$0
|-
+
| make sign for bike shop area out of old bike parts and such
+
|
+
|dustin
+
|
+
|-
+
| organize bike supplies
+
|
+
| dustin
+
|
+
 
|-
 
|-
 
| make a cart for folding chairs
 
| make a cart for folding chairs
 
|
 
|
 
|  
 
|  
|  
+
| ???
 
|-
 
|-
 
| replace vents in office area
 
| replace vents in office area
 
|  
 
|  
 
|
 
|
|  
+
|???
 
|-
 
|-
 
| cut vent in electronics room and install vent cover
 
| cut vent in electronics room and install vent cover
 
| there is a vent in wall that has been drywalled over
 
| there is a vent in wall that has been drywalled over
 
|  
 
|  
|
+
|???
 
|-
 
|-
 
| build shelves around window in electronics room
 
| build shelves around window in electronics room
 
|  
 
|  
 
|
 
|
|  
+
|$0 have shelves on hand
 
|-
 
|-
 
| make sharps box for tool crib area
 
| make sharps box for tool crib area
 
|  
 
|  
 
|
 
|
|  
+
| $0
 
|-
 
|-
 
| install cisco network gear into rack
 
| install cisco network gear into rack
 
| rocco will be bringing in a rack for this purpose
 
| rocco will be bringing in a rack for this purpose
 
| rocco
 
| rocco
|
+
|$0
 
|-
 
|-
 
| fix light in craft room
 
| fix light in craft room
 
| probably needs new ballast
 
| probably needs new ballast
 
|
 
|
|  
+
| $30
 
|-
 
|-
 
| craft room needs to be cleaned up and organized  
 
| craft room needs to be cleaned up and organized  
 
|  
 
|  
 
| mel
 
| mel
|
+
|$0
 
|-
 
|-
 
| clean up kitchen and throw out old stock of goods
 
| clean up kitchen and throw out old stock of goods
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| install small shelf to place microwave in cabinet
 
| install small shelf to place microwave in cabinet
 
| talk to dustin for direction
 
| talk to dustin for direction
 
|
 
|
|  
+
| $0
 
|-
 
|-
 
| talk to Bob B about painting fridge (brown one)
 
| talk to Bob B about painting fridge (brown one)
 
|  
 
|  
 
|  
 
|  
|
+
|$0
 
|-
 
|-
 
| make soda can dispensers for white refrigerator
 
| make soda can dispensers for white refrigerator
 
| talk to dustin for direction
 
| talk to dustin for direction
 
|
 
|
|  
+
| ???
 
|-
 
|-
 
|  
 
|  

Revision as of 16:44, 14 November 2011

NEW TASKS, as of October 2011

All this planning got you hungry? Head on over to the Foodie Page to get your feast planning on. Volunteer to bring your favorite dishes and show off your amazing culinary skills!

Task Next Action Volunteer? Approx Cost of materials
Repair kitchen door hinge. $0
Clear Genie-width path to member storage $0
Construct and affix dry-erase marker holders to every whiteboard $0
Collect, test, and sort all dry-erase markers and populate above holders. $0
remove MDF table/counters from wood shop ask swit to take home/remove $0
Mount monitor on/near rack, for admin KVM usage $0
Consolidate adhesives/solvents/cleaners/etc and label
each location with pointers to the other locations
$0
Bring blue bins down from attic and wash them all Matt O $0
Fridge cleanout Matt O $0
Affix QR codes to every tool with a wiki page $0
Cover roof openings, consider snow-melt drainage in your design $0
Level concrete near rack Joe $13
Garage-door concrete $4
Winterization stuff (Bill putt suggested -- need more specifics) $0
North & East Storm windows Get measurements and figure hardware Steve H $0
consolidate and shut down small black freezer Cherish $0
Run air hose to bike shop/laser run from main line and split into laser and bike area $12
add dividers to member storage shelves use tape or paint to divide the shelves into quarters
clean up FIRST area throw away junk and put all gear into bins below benches $0
sweep and vacuum your butt off everyone! $0
identify emergency exit routes and paint the lines we have floor marking paint, (update:picked up skinny rollers) $0
install other welding curtain talk to Nate B. he has vision for this $0
make bins/shelf for welding area metal storage $0
finish up audio system mount amplifiers in rack, mount speakers, run wire $0
hook up outdoor light outside main door $22
mount and wire security cameras talk to Joe B or Nate B about camera mount locations ?
Make boxes to store assorted tools in tool area identify tools which need boxes $0
create a wall partition between old graveyard and CNC area $26
clean up library in loft consolidate books down $0
remove desk from whiteboard room $0
make a bin for casters and wheels put bin in consumables area $0
organize fastener area organize and label fasteners $0
build table for little sanblaster talk to dustin about getting the sandblaster set up $9
clean up and organize consumables area this is the wire rack near the tool crib w/tape, switches, etc Cherish $60
Label every trash can with the size of bags it takes, and purchase bags of each size. $25
Wash trash cans $0
Reroute all e-room bench equipment power cords to go behind shelf
(empty shelf, rip half an inch off its depth, remount it, reload it)
$0
Label all E-room gear power cords (Many already done, follow example) $0
Repair / upgrade selected 115V circuits Documentation: Breaker Panels, Theater Lights Dave S ???
build a bench against the wall that will seperate woodshop from cnc area $60
seal off end of member storage shelves so that equipment can be butted against it $48
remove last row of member storage shelf against wall and move to other side of unit $0
build shelving above FIRST area nate w/rocco ???
make up first aid kits to place around shop need to purchase supplies $20
make vinyl signage for first aid kits $0
move cleaning cabinet to front of shop area $0
allocate two of the steel drums for aluminum and steel scrap put vinyl signage on drums $0
take down the few wrenches from pegboard in metal shop find usefulness in the metal shop pegboard $0
fix light on buffer in metal shop $10
allocate a metro rack for large batteries and chargers $0
address issues with the metal shop lighting replace some fixtures and add fixtures $20
organize and relocate the MDF that is stacked near the member storage $0
store unused dust collector manifold and filters in loft put filters in garbage bags $0
collaborate with Nick/Russ on removal and dismantling of sprite chase Nick/Russ? $0
move engine hoist to front of building by graveyard $0
organize panel storage area $0
make nice vinyl sign to go above panel storage area $0
move 5sl printer away from print shop over to server area. $0
organize vinyl cutter area. $0
install 2 ceiling fans that are still in boxes. 1 over metal shop other? ???
move plasma cutter over to cleared area by kiln $0
cleanup and organize laser cutter area. organize laser cutter stock $0
move vending machine to kitchen $0
level rough concrete $8
make signage to identify circuit breakers $0
make a cart for folding chairs  ???
replace vents in office area ???
cut vent in electronics room and install vent cover there is a vent in wall that has been drywalled over ???
build shelves around window in electronics room $0 have shelves on hand
make sharps box for tool crib area $0
install cisco network gear into rack rocco will be bringing in a rack for this purpose rocco $0
fix light in craft room probably needs new ballast $30
craft room needs to be cleaned up and organized mel $0
clean up kitchen and throw out old stock of goods $0
install small shelf to place microwave in cabinet talk to dustin for direction $0
talk to Bob B about painting fridge (brown one) $0
make soda can dispensers for white refrigerator talk to dustin for direction  ???