Difference between revisions of "ToDo"

From i3Detroit
Jump to: navigation, search
(added roomba, paint, and storage-numbering tasks)
(39 intermediate revisions by 8 users not shown)
Line 1: Line 1:
 +
 +
 
Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions?  contact Dustin White dustinbikes@gmail.com)
 
Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions?  contact Dustin White dustinbikes@gmail.com)
  
Line 11: Line 13:
 
! Approx Cost of materials
 
! Approx Cost of materials
 
|-
 
|-
| Clean and sweep under graveyard area
+
| Create vinyl signs
 +
| "DO NO SPRAY PAINT OUTSIDE OVER PAVEMENT!!"
 
|
 
|
 +
|
 +
|-
 +
| Repair Roomba charging circuit
 +
| find the FETs ordered for the repair
 
|
 
|
 
|
 
|
 
|-
 
|-
| Rearrange phone buttons so they're accurately labeled
+
| Paint keep-out lines on floor around electrical panels
| This is a firmware change, I just need to figure out which one it is.
+
|
| Nate W
+
|
| $0
+
|
 
|-
 
|-
| Make "how to transfer calls, etc" cheatsheet for each phone
+
| Number the spaces in member storage
| Figure that out!
+
| cut vinyl digits and lines
|  
+
|
| $0
+
|
 
|-
 
|-
|make vinyl "propaganda signs"
+
| hang new banner over garage door
|sayings about keeping the place clean and such
+
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|make stencil on lasercutter
+
| update the photos on our hackerspaces.org page
|sayings "SWEEP If you can't read this" spraypaint on woodshop floor
+
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|install seals around garage door
+
| Change the oil in the air compressor
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|mount dust collector switches
+
| Clean out and move Nick's stuff to bay
| Second switch needs ran next to the chopsaw!
+
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|sweep and vaccum
+
| Reaffix lights to kitchen ceiling
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|get audio system up and running
+
| Upgrade air-compressor plumbing.
|run wire from speakers back to backboard <- Whats this mean, who do I ask?
+
| Spec out components for 1/2" line between compressor and building-line.
 
|
 
|
|terminal strips already in e-room bin
+
| $20-30
 
|-
 
|-
|mount and wire security cameras
+
| Affix chainlink fence or other material around dust collector chain area
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|install automatic drain on air compressor
+
| Display T-shirts in kitchen
 +
|
 
|
 
|
 +
|
 +
|-
 +
| Resupply all papertowel/tape/pen holders
 +
|
 
|
 
|
 +
| $15
 +
|-
 +
| Replace/add additional lighting. T8 fixtures.
 +
| Survey locations and circuits, update this page.
 
|
 
|
 +
| $100-200
 
|-
 
|-
|organize above window lumber storage areas
+
| <strike>Fix/redesign flammables cabinet latch</strike>
 +
|
 +
| thanks Nate W!
 +
|
 +
|-
 +
| Untangle ratchet straps
 +
|
 +
|
 +
|
 +
|-
 +
| Zoned motion office Lighting
 +
| Source some ultrasonic motion detectors.
 
|
 
|
 +
| $100-300
 +
|-
 +
| Organize
 +
| Remove clutter/fire/tripping/where does this go hazards from floor and aisle ways
 
|
 
|
 
|
 
|
 
|-
 
|-
|organize scrap lumber under chop saw
+
| Metal shop cord reel has extension cord
 +
| Remove, run conduit and outlet double-gang box.
 
|
 
|
 +
|
 +
|-
 +
| Whiteboard room clutter
 +
| CLEAN AND ORGANIZE!!
 
|
 
|
 
|
 
|
 
|-
 
|-
|Chain link fence cage for dust collector
+
| Welding light has extension cord
 +
| 2x 15' ext cords?
 
|
 
|
 +
|
 +
|-
 +
| light over bay
 +
| 1x 10' ext cord
 
|
 
|
 
|
 
|
 
|-
 
|-
|add Cowl to furnaces
+
| Re-re-hang the welding curtain so it juuuust touches the ground.
|aim into metal shop, aim at west side of shop.
+
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|Forklift repair
+
| <strike>Fire extinguishers</strike>
|Repair ignition switch
+
| <strike>Renew</strike>
 +
|
 +
|
 +
|-
 +
| Metal shop fan
 +
| fix or remove
 +
|
 +
|
 +
|-
 +
| Remove extension cords from ceiling beams, tidy up the overhead situation in general
 +
|
 +
|
 +
|
 +
|-
 +
| Finish edges of e-room carpet
 +
|
 +
|
 +
|
 +
|-
 +
| Build electronic crashbar for front door
 +
|
 +
|
 +
|
 +
|-
 +
| Clean and sweep under graveyard area
 +
|
 
|
 
|
 
|
 
|
Line 96: Line 163:
 
|
 
|
 
|-
 
|-
|purge graveyard
+
| Rearrange phone buttons so they're accurately labeled
 +
| This is a firmware change, I just need to figure out which one it is.
 +
| Nate W
 +
| $0
 +
|-
 +
| Make "how to transfer calls, etc" cheatsheet for each phone
 +
| Figure that out! - http://i3detroit.com/wi/images/d/da/Soundpoint_ip501_quick_user_guide.pdf
 +
|
 +
| $0
 +
|-
 +
| make more "propaganda signs"
 +
| sayings about labeling your stuff and such
 +
|
 +
|
 +
|-
 +
| install seals around garage door
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|manage scrap metal near welding
+
| mount dust collector switches
 +
| Second switch needs ran next to the chopsaw!
 +
| Greg installed magnet on Saw switch may be ok
 +
| G donated Magnet
 +
|-
 +
|sweep and vaccum
 
|
 
|
 +
|Everyone - Everyday!
 
|
 
|
 +
|-
 +
|get audio system up and running
 +
|run wire from speakers back to backboard <- Whats this mean, who do I ask?
 
|
 
|
 +
|terminal strips already in e-room bin
 
|-
 
|-
|cyclone fence around kilm
+
|mount and wire security cameras
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|assemble last set of orange shelves
+
| <strike>install automatic drain on air compressor</strike>
|the ends arnt the same, either welding together or drilling and bolting
+
|
 +
|
 +
|
 +
|-
 +
|add Cowl to furnaces
 +
|aim into metal shop, aim at west side of shop.
 +
|
 +
|
 +
|-
 +
|<strike>Forklift repair</strike>
 +
|<strike>Repair ignition switch</strike>
 +
|
 +
|
 +
|-
 +
|Finish forklift repair
 +
|Install protection for vulnerable wiring harness, etc.?
 +
|
 +
|
 +
|-
 +
|<strike>purge graveyard</strike>
 +
|
 +
|
 +
|
 +
|-
 +
|manage scrap metal near welding
 +
|
 +
|
 +
|
 +
|-
 +
|<strike>cyclone fence around kiln</strike>
 +
|
 +
|Terry W
 +
|$150
 +
|-
 +
|<strike>assemble last set of orange shelves</strike>
 +
|<strike>the ends arnt the same, either welding together or drilling and bolting</strike>
 
|Nate W
 
|Nate W
 
|
 
|
 
|-
 
|-
|find home for injection molders
+
|<strike>find home for injection molders</strike>
 
| ?? - current home u no like?
 
| ?? - current home u no like?
 
|
 
|
 
|
 
|
 
|-
 
|-
|find new home for paint
+
|<strike>find new home for paint</strike>
 
|
 
|
 
|
 
|
Line 141: Line 268:
 
|
 
|
 
|-
 
|-
|rubber shroud for dust collector
+
|<strike>rubber shroud for dust collector</strike>
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|have nick take home lights, juki, and jointer
+
|<strike>have nick take home lights, juki, and jointer</strike>
 
|
 
|
 
|
 
|
Line 156: Line 283:
 
|
 
|
 
|-
 
|-
|build a workbench area for laser cutter
+
|install more-closely-spaced vertical dividers in wood shop sheet storage
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|build 3 lockable money boxes
+
|<strike>build a workbench area for laser cutter</strike>
 
|
 
|
 +
|
 +
|
 +
|-
 +
|<strike>build 3 lockable money boxes</strike>
 +
| 3 done
 +
| Greg Smith
 +
| 12.82
 +
|-
 +
|Rebuild Miter Saw Stand and Bench
 +
|Saving floor Space
 
|
 
|
 
|
 
|
 
|-
 
|-
 
|build tool holder for vinyl area
 
|build tool holder for vinyl area
 +
|This would be nice to vacuum form!
 +
|
 +
|
 +
|-
 +
|<strike>organize cleaning cabinet</strike>
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|find a solution to have am aux jack at commons table for audio
+
| setup scanner/copier/blog station
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|organize cleaning cabinet
+
| return little busted ass laser to AHA
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|setup scanner/copier/blog station
+
| build cart for large power supplies
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|return little busted ass laser to AHA
+
|clean the hell out of craft room
 +
|Complete inventory of shit, er, supplies; file plan for minor layout changes: Tues. PM (see [[Craft Room Inventory: 20121110]])
 +
|Kevin Flory
 +
|Under $50
 +
|-
 +
|<strike>move rack into kitchen for extra pop</strike>
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|build cart for large power supplies
+
|clean kitchen and mop office floors
 +
|Wax floors later in the night after everyone is done up front
 
|
 
|
 +
|
 +
|-
 +
|<strike>buy 3 drawer thingy for kitchen</strike>
 +
|buy utensils and bowls for kitchen from dollar tree
 
|
 
|
 
|
 
|
 
|-
 
|-
|clean the hell out of craft room
+
|<strike>Build wood shop machine cart</strike>
 +
|All tools on Carts
 +
|
 +
|
 +
|-
 +
|Remove stored wood from machine shop loft, cull/sort stored metal
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|move rack into kitchen for extra pop
+
|<strike>Install Casters on Wood Shop router table</strike>
 +
|Admire how nice it is
 +
|Greg Smith
 
|
 
|
 +
|-
 +
|<strike>Move Drill Press to Wood Shop</strike>
 +
|Find better location in Wood Shop, NOT in front of sweep drop to dust collector.
 
|
 
|
 
|
 
|
 
|-
 
|-
|clean kitchen and mop floor
+
|<strike>Make "I don't know where this goes" boxes for each main area</strike>
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|buy 3 drawer thingy for kitchen
+
|Add dust cover to south side of freestanding member storage
|buy untensils and bowls for kitchen from dollar tree
+
 
|
 
|
 
|
 
|
 +
|
 +
|-
 +
|<strike>Move SandBlast Station and supplies to East Wall between Welding Zone and Overhead Door</strike>
 +
|
 +
|Jim Kemp
 +
|$0
 +
|-
 +
| <strike>Bolt the machine shop bench to the North wall </strike>
 +
|
 +
| Ted
 +
| $0
 +
|-
 +
| <strike>Audit Door Access keys</strike>
 +
|
 +
| Nate W
 +
| $0
 
|-
 
|-
  
 
[[Category:Organization Information]][[Category:Reference Data]]
 
[[Category:Organization Information]][[Category:Reference Data]]

Revision as of 06:47, 16 May 2013


Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions? contact Dustin White dustinbikes@gmail.com)

Need supplies? Toss 'em on the ShoppingList and maybe somebody will check that page from their phone next time they're at the store.


Task Next Action Volunteer? Approx Cost of materials
Create vinyl signs "DO NO SPRAY PAINT OUTSIDE OVER PAVEMENT!!"
Repair Roomba charging circuit find the FETs ordered for the repair
Paint keep-out lines on floor around electrical panels
Number the spaces in member storage cut vinyl digits and lines
hang new banner over garage door
update the photos on our hackerspaces.org page
Change the oil in the air compressor
Clean out and move Nick's stuff to bay
Reaffix lights to kitchen ceiling
Upgrade air-compressor plumbing. Spec out components for 1/2" line between compressor and building-line. $20-30
Affix chainlink fence or other material around dust collector chain area
Display T-shirts in kitchen
Resupply all papertowel/tape/pen holders $15
Replace/add additional lighting. T8 fixtures. Survey locations and circuits, update this page. $100-200
Fix/redesign flammables cabinet latch thanks Nate W!
Untangle ratchet straps
Zoned motion office Lighting Source some ultrasonic motion detectors. $100-300
Organize Remove clutter/fire/tripping/where does this go hazards from floor and aisle ways
Metal shop cord reel has extension cord Remove, run conduit and outlet double-gang box.
Whiteboard room clutter CLEAN AND ORGANIZE!!
Welding light has extension cord 2x 15' ext cords?
light over bay 1x 10' ext cord
Re-re-hang the welding curtain so it juuuust touches the ground.
Fire extinguishers Renew
Metal shop fan fix or remove
Remove extension cords from ceiling beams, tidy up the overhead situation in general
Finish edges of e-room carpet
Build electronic crashbar for front door
Clean and sweep under graveyard area
Replace twitterbot camera
Rearrange phone buttons so they're accurately labeled This is a firmware change, I just need to figure out which one it is. Nate W $0
Make "how to transfer calls, etc" cheatsheet for each phone Figure that out! - http://i3detroit.com/wi/images/d/da/Soundpoint_ip501_quick_user_guide.pdf $0
make more "propaganda signs" sayings about labeling your stuff and such
install seals around garage door
mount dust collector switches Second switch needs ran next to the chopsaw! Greg installed magnet on Saw switch may be ok G donated Magnet
sweep and vaccum Everyone - Everyday!
get audio system up and running run wire from speakers back to backboard <- Whats this mean, who do I ask? terminal strips already in e-room bin
mount and wire security cameras
install automatic drain on air compressor
add Cowl to furnaces aim into metal shop, aim at west side of shop.
Forklift repair Repair ignition switch
Finish forklift repair Install protection for vulnerable wiring harness, etc.?
purge graveyard
manage scrap metal near welding
cyclone fence around kiln Terry W $150
assemble last set of orange shelves the ends arnt the same, either welding together or drilling and bolting Nate W
find home for injection molders  ?? - current home u no like?
find new home for paint
cleanup and revamp hardware land
fix sandblasters
build shelf on sw metal shop wall for storage of materials
rubber shroud for dust collector
have nick take home lights, juki, and jointer
go through wood stock and dispose of unusable
install more-closely-spaced vertical dividers in wood shop sheet storage
build a workbench area for laser cutter
build 3 lockable money boxes 3 done Greg Smith 12.82
Rebuild Miter Saw Stand and Bench Saving floor Space
build tool holder for vinyl area This would be nice to vacuum form!
organize cleaning cabinet
setup scanner/copier/blog station
return little busted ass laser to AHA
build cart for large power supplies
clean the hell out of craft room Complete inventory of shit, er, supplies; file plan for minor layout changes: Tues. PM (see Craft Room Inventory: 20121110) Kevin Flory Under $50
move rack into kitchen for extra pop
clean kitchen and mop office floors Wax floors later in the night after everyone is done up front
buy 3 drawer thingy for kitchen buy utensils and bowls for kitchen from dollar tree
Build wood shop machine cart All tools on Carts
Remove stored wood from machine shop loft, cull/sort stored metal
Install Casters on Wood Shop router table Admire how nice it is Greg Smith
Move Drill Press to Wood Shop Find better location in Wood Shop, NOT in front of sweep drop to dust collector.
Make "I don't know where this goes" boxes for each main area
Add dust cover to south side of freestanding member storage
Move SandBlast Station and supplies to East Wall between Welding Zone and Overhead Door Jim Kemp $0
Bolt the machine shop bench to the North wall Ted $0
Audit Door Access keys Nate W $0