Difference between revisions of "ToDo"

From i3Detroit
Jump to: navigation, search
m (Removed task that is done, updated another task.)
(40 intermediate revisions by 11 users not shown)
Line 1: Line 1:
Bored? Got an urge to do stuff for the space? Pick a task from this list, and advance it. Ask for help if you need it.  
+
Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions?  contact Dustin White dustinbikes@gmail.com)
  
 
Need supplies? Toss 'em on the [[ShoppingList]] and maybe somebody will check that page from their phone next time they're at the store.
 
Need supplies? Toss 'em on the [[ShoppingList]] and maybe somebody will check that page from their phone next time they're at the store.
Line 11: Line 11:
 
! Approx Cost of materials
 
! Approx Cost of materials
 
|-
 
|-
| Fix OFF switch on Grizzly (wood) band saw.
+
| Clean and sweep under graveyard area
| <strike></strike>
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| <strike>Replace light fixture just inside the main door</strike>
+
| Rearrange phone buttons so they're accurately labeled
| <strike>Nate W got the fixtures. Now need to be installed</strike>
+
| This is a firmware change, I just need to figure out which one it is.
 
| Nate W
 
| Nate W
| $22
+
| $0
 
|-
 
|-
| <strike>Buy more T-8 bulbs </strike>
+
| Make "how to transfer calls, etc" cheatsheet for each phone
| 10+ pack, We use T-8 4100k Could always use more.
+
| Figure that out!
| Nate W
+
| $20-25
+
|-
+
| Move tool crib drop cord reel from light-switch circuit to another circuit
+
| ask Dave S about an (apparently) unused circuit in the SE shop ceiling conduits
+
|  
+
 
|  
 
|  
 +
| $0
 
|-
 
|-
| Replace ceiling fan by parts area, rehang commons fan, de-kludge fan wiring
+
|make vinyl "propaganda signs"
| note: new fan is up and running, other tasks remain
+
|sayings about keeping the place clean and such
| Dave S
+
|
|  
+
|
 
|-
 
|-
| Uninstall old ass furnace in large door bay.
+
|make stencil on lasercutter
| Unit is inefficient, and useless!
+
|sayings "SWEEP If you can't read this" spraypaint on woodshop floor
| Genie + Forklift
+
|
| $0 ?
+
|
 
|-
 
|-
| Move light switches near door  
+
|install seals around garage door
| Install switches by main entrance to control all overhead lights.<br> - Leave machine shop separate, reroute switch within machine shop.
+
|
|  
+
|
| &nbsp;??
+
|
 
|-
 
|-
| <strike>Clean crud out of washtub! </strike>
+
|mount dust collector switches
| <strike>EWWWW&nbsp;:( </strike>
+
| Second switch needs ran next to the chopsaw!
| You are my hero!
+
| Greg installed magnet on Saw switch may be ok
|  
+
| G donated Magnet
 
|-
 
|-
| Vinyl propaganda signs
+
|sweep and vaccum
| Come up with sayings "Sweep around machines, do I look like your mom?"
+
|
| Nate W/Vinyl Team
+
|
| $0
+
|
 
|-
 
|-
| Redo drip pan above server rack before it turns into a waterfall.
+
|get audio system up and running
| Install drain tube down to washtub
+
|run wire from speakers back to backboard <- Whats this mean, who do I ask?
|  
+
|
| $10-20?
+
|terminal strips already in e-room bin
 
|-
 
|-
| Install shelving in Power wheels area, re-purpose benches.
+
|mount and wire security cameras
| Find more 12-14' pallet racking
+
|
| nate w / rocco / anyone!
+
|
| &nbsp;???
+
|
 
|-
 
|-
| Garage-door floor
+
|install automatic drain on air compressor
| Raise concrete level below door higher than outside. <br> Home depot has thick rubber seals that would help too. $10ish
+
|
| Nate W
+
|
| $4-14
+
|
 
|-
 
|-
| Redo shop restroom
+
|organize above window lumber storage areas
| Remount &amp; Paint stalls, Title floor, Cover walls.
+
|
|  
+
|
| $$$? - a lot
+
|
 
|-
 
|-
| seal off end of member storage shelves in woodshop so that equipment can be butted against it.
+
|organize scrap lumber under chop saw
| Screw panels to ends of shelves, and between to create full wall.
+
|
|  
+
|
| $48
+
|
 
|-
 
|-
| Mount and wire motor to dust collector  
+
|Chain link fence cage for dust collector
|
+
| Ted and Nate B <br> are looking into this.
+
|
+
|-
+
| Mount dust collector relays
+
| 1 on dust collector, 2nd near table saw.
+
|
+
|
+
|-
+
| &nbsp;
+
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
| '''PRIOR TASKS THAT STILL NEED DONE!!'''
+
|add Cowl to furnaces
|  
+
|aim into metal shop, aim at west side of shop.
|  
+
|
|  
+
|
 
|-
 
|-
| Update MSDS binder by door
+
|Forklift repair
|  
+
|Repair ignition switch
|  
+
|
|  
+
|
 
|-
 
|-
| <strike>Affix laser-cutter inner lights with Dual-Lock strips </strike>
+
|Replace twitterbot camera
| Get high off 3m adhesive primer
+
|
| Anyone? See Nate B
+
|
| $0
+
|
 
|-
 
|-
| Construct shop-vac accessories rack
+
|purge graveyard
| Gather all nozzles and design rack
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| Clear Genie-width path to member storage
+
|manage scrap metal near welding
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| remove MDF table/counters from wood shop
+
|cyclone fence around kilm
| ask Nick to take home/remove
+
|
|  
+
|Terry W
| $0
+
|$150
 
|-
 
|-
| Mount monitor on/near rack, for admin KVM usage
+
|assemble last set of orange shelves
|  
+
|the ends arnt the same, either welding together or drilling and bolting
|  
+
|Nate W
| $0
+
|
 
|-
 
|-
| Consolidate adhesives/solvents/cleaners/etc and label <br>each&nbsp;location&nbsp;with pointers to the other
+
|find home for injection molders
|  
+
| ?? - current home u no like?
|  
+
|
|  
+
|
 
|-
 
|-
| Cover roof openings, consider snow-melt drainage in your design
+
|find new home for paint
| Adjust rear shop cover, cover is not air tight and has shifted with a draft.
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| Winterization stuff (Bill putt suggested -- need more specifics)
+
|cleanup and revamp hardware land
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| add dividers to member storage shelves
+
|fix sandblasters
| use tape or paint to divide the shelves into quarters
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| clean up FIRST area
+
|build shelf on sw metal shop wall for storage of materials
| throw away junk and put all gear into bins below benches
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| sweep and vacuum your butt off
+
|rubber shroud for dust collector
|  
+
|
| everyone!
+
|
| $0
+
|
 
|-
 
|-
| identify emergency exit routes and paint the lines
+
|have nick take home lights, juki, and jointer
| we have floor marking paint, (update:picked up skinny rollers)
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| finish up audio system
+
|go through wood stock and dispose of unusable
| mount amplifiers in rack, mount speakers, run wire
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| mount and wire security cameras
+
|build a workbench area for laser cutter
| talk to Joe B or Nate B about camera mount locations
+
|
|  
+
|
| &nbsp;?
+
|
 
|-
 
|-
| Make boxes to store assorted tools in tool area
+
|build 3 lockable money boxes
| identify tools which need boxes
+
| one done 2 to go
|  
+
| Greg Smith
| $0
+
| 12.82
 
|-
 
|-
| remove desk from whiteboard room
+
|build tool holder for vinyl area
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| organize fastener area
+
|find a solution to have am aux jack at commons table for audio
| organize and label fasteners
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| build table for little sanblaster
+
|organize cleaning cabinet
| talk to dustin about getting the sandblaster set up
+
|
|  
+
|
| $9
+
|
 
|-
 
|-
| Reroute all e-room bench equipment power cords to go behind shelf<br> (empty shelf, rip half an inch off its depth, remount it, reload it)
+
|setup scanner/copier/blog station
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| Label all E-room gear power cords (Many already done, follow example)
+
|return little busted ass laser to AHA
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| Document 115V circuits
+
|build cart for large power supplies
| Documentation: [[Breaker Panels]]
+
|
| Dave S
+
|
|  
+
|
 
|-
 
|-
| allocate two of the steel drums for aluminum and steel scrap
+
|clean the hell out of craft room
| put vinyl signage on drums
+
|Complete inventory of shit, er, supplies; file plan for minor layout changes: Tues. PM (see [[Craft Room Inventory: 20121110]])
|  
+
|Kevin Flory
| $0
+
|Under $50
 
|-
 
|-
| store unused dust collector manifold and filters in loft
+
|move rack into kitchen for extra pop
| put filters in garbage bags
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| move 5sl printer away from print shop over to server area.
+
|clean kitchen and mop floor
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| organize vinyl cutter area.
+
|buy 3 drawer thingy for kitchen
|  
+
|buy untensils and bowls for kitchen from dollar tree
|  
+
|
 +
|
 
|-
 
|-
| level rough concrete
+
|hang shop light over table saw
|  
+
|buy shop light for two 4ft T8 bulbs
|  
+
|
| $8
+
|$20
 
|-
 
|-
| make signage to identify circuit breakers
+
|mount pegboard box on NW user storage end cap
|  
+
|box is clamped in place, needs permanent fastening
|  
+
|
| $0
+
|$0, supplies on hand
 
|-
 
|-
| make a cart for folding chairs
+
|Build wood shop machine cart
|  
+
|
|  
+
|
| &nbsp;???
+
|
 
|-
 
|-
| replace vents in office area
+
|Install Casters on Wood Shop router table
|  
+
|Admire how nice it is
|  
+
|Greg Smith
| &nbsp;???
+
|
 
|-
 
|-
| cut vent in electronics room and install vent cover
+
|Move Drill Press to Wood Shop
| there is a vent in wall that has been drywalled over
+
|
|  
+
|
| &nbsp;???
+
|
 
|-
 
|-
| install cisco network gear into rack
+
|Make "I don't know where this goes" boxes for each main area
| rocco will be bringing in a rack for this purpose
+
|
| rocco
+
|
| $0
+
|
 
|-
 
|-
| clean up kitchen and throw out old stock of goods
+
|Add dust cover to south side of freestanding member storage
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| install small shelf to place microwave in cabinet
+
|Move SandBlast Station and supplies to East Wall between Welding Zone and Overhead Door
| talk to dustin for direction
+
|
|  
+
|Jim Kemp
| $0
+
|$0
 
|-
 
|-
| talk to Bob B about painting fridge (brown one)
+
| Bolt the machine shop bench to the North wall
|  
+
|
|  
+
| Ted
 
| $0
 
| $0
 
|-
 
|-
| make soda can dispensers for white refrigerator
+
 
| talk to dustin for direction
+
[[Category:Organization Information]][[Category:Reference Data]]
|
+
| &nbsp;???
+
|-
+
| pull down drum from metal dust collector in metal shop
+
| assess if machine is in functioning order
+
|
+
|
+
|-
+
| Mount Sorensen PSU under e-lab shelf
+
|
+
| Nate or Joe
+
|
+
|}
+

Revision as of 04:44, 27 November 2012

Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions? contact Dustin White dustinbikes@gmail.com)

Need supplies? Toss 'em on the ShoppingList and maybe somebody will check that page from their phone next time they're at the store.


Task Next Action Volunteer? Approx Cost of materials
Clean and sweep under graveyard area
Rearrange phone buttons so they're accurately labeled This is a firmware change, I just need to figure out which one it is. Nate W $0
Make "how to transfer calls, etc" cheatsheet for each phone Figure that out! $0
make vinyl "propaganda signs" sayings about keeping the place clean and such
make stencil on lasercutter sayings "SWEEP If you can't read this" spraypaint on woodshop floor
install seals around garage door
mount dust collector switches Second switch needs ran next to the chopsaw! Greg installed magnet on Saw switch may be ok G donated Magnet
sweep and vaccum
get audio system up and running run wire from speakers back to backboard <- Whats this mean, who do I ask? terminal strips already in e-room bin
mount and wire security cameras
install automatic drain on air compressor
organize above window lumber storage areas
organize scrap lumber under chop saw
Chain link fence cage for dust collector
add Cowl to furnaces aim into metal shop, aim at west side of shop.
Forklift repair Repair ignition switch
Replace twitterbot camera
purge graveyard
manage scrap metal near welding
cyclone fence around kilm Terry W $150
assemble last set of orange shelves the ends arnt the same, either welding together or drilling and bolting Nate W
find home for injection molders  ?? - current home u no like?
find new home for paint
cleanup and revamp hardware land
fix sandblasters
build shelf on sw metal shop wall for storage of materials
rubber shroud for dust collector
have nick take home lights, juki, and jointer
go through wood stock and dispose of unusable
build a workbench area for laser cutter
build 3 lockable money boxes one done 2 to go Greg Smith 12.82
build tool holder for vinyl area
find a solution to have am aux jack at commons table for audio
organize cleaning cabinet
setup scanner/copier/blog station
return little busted ass laser to AHA
build cart for large power supplies
clean the hell out of craft room Complete inventory of shit, er, supplies; file plan for minor layout changes: Tues. PM (see Craft Room Inventory: 20121110) Kevin Flory Under $50
move rack into kitchen for extra pop
clean kitchen and mop floor
buy 3 drawer thingy for kitchen buy untensils and bowls for kitchen from dollar tree
hang shop light over table saw buy shop light for two 4ft T8 bulbs $20
mount pegboard box on NW user storage end cap box is clamped in place, needs permanent fastening $0, supplies on hand
Build wood shop machine cart
Install Casters on Wood Shop router table Admire how nice it is Greg Smith
Move Drill Press to Wood Shop
Make "I don't know where this goes" boxes for each main area
Add dust cover to south side of freestanding member storage
Move SandBlast Station and supplies to East Wall between Welding Zone and Overhead Door Jim Kemp $0
Bolt the machine shop bench to the North wall Ted $0