Difference between revisions of "ToDo"

From i3Detroit
Jump to: navigation, search
(42 intermediate revisions by 10 users not shown)
Line 1: Line 1:
NEW TASKS, as of January 2012
+
Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions?  contact Dustin White dustinbikes@gmail.com)
 +
 
 +
Need supplies? Toss 'em on the [[ShoppingList]] and maybe somebody will check that page from their phone next time they're at the store.
  
<strike>All this planning got you hungry? Head on over to the </strike>[[Potlock Menu Planning|<strike>Foodie Page</strike>]]<strike>to get your feast planning on. Volunteer to bring your favorite dishes and show off your amazing culinary skills!</strike>
 
  
 
{| cellspacing="1" cellpadding="1" border="1"
 
{| cellspacing="1" cellpadding="1" border="1"
Line 10: Line 11:
 
! Approx Cost of materials
 
! Approx Cost of materials
 
|-
 
|-
| <strike>Replace light fixture just inside the main door</strike>
+
| Clean and sweep under graveyard area
| <strike>Nate W got the fixtures. Now need to be installed</strike>
+
|
| Nate W
+
|
| $22
+
|
 
|-
 
|-
| <strike>Buy more T-8 bulbs </strike>
+
| Rearrange phone buttons so they're accurately labeled
| 10+ pack, We use T-8 4100k Could always use more.
+
| This is a firmware change, I just need to figure out which one it is.
 
| Nate W
 
| Nate W
| $20-25
+
| $0
 
|-
 
|-
| Replace ceiling fan by parts area
+
| Make "how to transfer calls, etc" cheatsheet for each phone
| note: new fan is on kiln table, labeled "FAN"  
+
| Figure that out!
 
|  
 
|  
|
 
|-
 
| Uninstall old ass furnace in large door bay.
 
| Unit is inefficient, and useless!
 
| Genie + Forklift
 
| $0 ?
 
|-
 
| Move light switches near door
 
| Install switches by main entrance to control all overhead lights.<br> - Leave machine shop separate, reroute switch within machine shop.
 
|
 
| &nbsp;??
 
|-
 
| Clean crud out of washtub!
 
| EWWWW&nbsp;:(
 
| SOMEONE?
 
|
 
|-
 
| Vinyl propaganda signs
 
| Come up with sayings "Sweep around machines, do I look like your mom?"
 
| Nate W/Vinyl Team
 
 
| $0
 
| $0
 
|-
 
|-
| Redo drip pan above server rack before it turns into a waterfall.
+
|make vinyl "propaganda signs"
| Install drain tube down to washtub
+
|sayings about keeping the place clean and such
|  
+
|
| $10-20?
+
|
 
|-
 
|-
| Install shelving in Power wheels area, re-purpose benches.
+
|make stencil on lasercutter
| Find more 12-14' pallet racking
+
|sayings "SWEEP If you can't read this" spraypaint on woodshop floor
| nate w / rocco / anyone!
+
|
| &nbsp;???
+
|
 
|-
 
|-
| Garage-door floor
+
|install seals around garage door
| Raise concrete level below door higher than outside. <br> Home depot has thick rubber seals that would help too. $10ish
+
|
| Nate W
+
|
| $4-14
+
|
 
|-
 
|-
| Redo shop restroom
+
|mount dust collector switches
| Remount &amp; Paint stalls, Title floor, Cover walls.
+
| Second switch needs ran next to the chopsaw!
|  
+
| Greg installed magnet on Saw switch may be ok
| $$$? - a lot
+
| G donated Magnet
 
|-
 
|-
| seal off end of member storage shelves in woodshop so that equipment can be butted against it.
+
|sweep and vaccum
| Screw panels to ends of shelves, and between to create full wall.
+
|
|  
+
|
| $48
+
|
 
|-
 
|-
| Mount and wire motor to dust collector
+
|get audio system up and running
|  
+
|run wire from speakers back to backboard <- Whats this mean, who do I ask?
| Ted and Nate B <br> are looking into this.
+
|
|
+
|terminal strips already in e-room bin
 
|-
 
|-
| Mount dust collector relays
+
|mount and wire security cameras
| 1 on dust collector, 2nd near table saw.
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| &nbsp;
+
|install automatic drain on air compressor
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
| '''PRIOR TASKS THAT STILL NEED DONE!!'''
+
|organize above window lumber storage areas
|  
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| Update MSDS binder by door
+
|organize scrap lumber under chop saw
|  
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| <strike>Affix laser-cutter inner lights with Dual-Lock strips </strike>
+
|Chain link fence cage for dust collector
| Get high off 3m adhesive primer
+
|
| Anyone? See Nate B
+
|
| $0
+
|
 
|-
 
|-
| Construct shop-vac accessories rack
+
|add Cowl to furnaces
| Gather all nozzles and design rack
+
|aim into metal shop, aim at west side of shop.
|  
+
|
|  
+
|
 
|-
 
|-
| Clear Genie-width path to member storage
+
|Forklift repair
|  
+
|Repair ignition switch
|  
+
|
| $0
+
|
 
|-
 
|-
| remove MDF table/counters from wood shop
+
|Replace twitterbot camera
| ask Nick to take home/remove
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| Mount monitor on/near rack, for admin KVM usage
+
|purge graveyard
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| Consolidate adhesives/solvents/cleaners/etc and label <br>each&nbsp;location&nbsp;with pointers to the other
+
|manage scrap metal near welding
|  
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| Cover roof openings, consider snow-melt drainage in your design
+
|cyclone fence around kilm
| Adjust rear shop cover, cover is not air tight and has shifted with a draft.
+
|
|  
+
|Terry W
| $0
+
|
 
|-
 
|-
| Winterization stuff (Bill putt suggested -- need more specifics)
+
|assemble last set of orange shelves
|  
+
|the ends arnt the same, either welding together or drilling and bolting
|  
+
|Nate W
| $0
+
|
 
|-
 
|-
| add dividers to member storage shelves
+
|find home for injection molders
| use tape or paint to divide the shelves into quarters
+
| ?? - current home u no like?
|  
+
|
|  
+
|
 
|-
 
|-
| clean up FIRST area
+
|find new home for paint
| throw away junk and put all gear into bins below benches
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| sweep and vacuum your butt off
+
|cleanup and revamp hardware land
|  
+
|
| everyone!
+
|
| $0
+
|
 
|-
 
|-
| identify emergency exit routes and paint the lines
+
|fix sandblasters
| we have floor marking paint, (update:picked up skinny rollers)
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| finish up audio system
+
|build shelf on sw metal shop wall for storage of materials
| mount amplifiers in rack, mount speakers, run wire
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| mount and wire security cameras
+
|rubber shroud for dust collector
| talk to Joe B or Nate B about camera mount locations
+
|
|  
+
|
| &nbsp;?
+
|
 
|-
 
|-
| Make boxes to store assorted tools in tool area
+
|have nick take home lights, juki, and jointer
| identify tools which need boxes
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| remove desk from whiteboard room
+
|go through wood stock and dispose of unusable
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| organize fastener area  
+
|build a workbench area for laser cutter
| organize and label fasteners
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| build table for little sanblaster
+
|build 3 lockable money boxes
| talk to dustin about getting the sandblaster set up
+
| one done 2 to go
|  
+
| Greg Smith
| $9
+
| 12.82
 
|-
 
|-
| Reroute all e-room bench equipment power cords to go behind shelf<br> (empty shelf, rip half an inch off its depth, remount it, reload it)
+
|build tool holder for vinyl area
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| Label all E-room gear power cords (Many already done, follow example)
+
|find a solution to have am aux jack at commons table for audio
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| Repair / upgrade selected 115V circuits
+
|organize cleaning cabinet
| Documentation: [[Breaker Panels]], [[Theater Lights]]
+
|
| Dave S
+
|
| &nbsp;???
+
|
 
|-
 
|-
| allocate two of the steel drums for aluminum and steel scrap
+
|setup scanner/copier/blog station
| put vinyl signage on drums
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| store unused dust collector manifold and filters in loft
+
|return little busted ass laser to AHA
| put filters in garbage bags
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| move 5sl printer away from print shop over to server area.
+
|build cart for large power supplies
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| organize vinyl cutter area.
+
|clean the hell out of craft room
|  
+
|
|  
+
|
 +
|
 
|-
 
|-
| level rough concrete
+
|move rack into kitchen for extra pop
|  
+
|
|  
+
|
| $8
+
|
 
|-
 
|-
| make signage to identify circuit breakers
+
|clean kitchen and mop floor
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| make a cart for folding chairs
+
|buy 3 drawer thingy for kitchen
|  
+
|buy untensils and bowls for kitchen from dollar tree
|  
+
|
| &nbsp;???
+
|
 
|-
 
|-
| replace vents in office area
+
|hang shop light over table saw
|  
+
|buy shop light for two 4ft T8 bulbs
|  
+
|
| &nbsp;???
+
|$20
 
|-
 
|-
| cut vent in electronics room and install vent cover
+
|mount pegboard box on NW user storage end cap
| there is a vent in wall that has been drywalled over
+
|box is clamped in place, needs permanent fastening
|  
+
|
| &nbsp;???
+
|$0, supplies on hand
 
|-
 
|-
| install cisco network gear into rack
+
|Build wood shop machine cart
| rocco will be bringing in a rack for this purpose
+
|
| rocco
+
|
| $0
+
|
 
|-
 
|-
| clean up kitchen and throw out old stock of goods
+
|Install Casters on Wood Shop router table
|  
+
|Admire how nice it is
|  
+
|Greg Smith
| $0
+
|
 
|-
 
|-
| install small shelf to place microwave in cabinet
+
|Move Drill Press to Wood Shop
| talk to dustin for direction
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| talk to Bob B about painting fridge (brown one)
+
|Make "I don't know where this goes" boxes for each main area
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| make soda can dispensers for white refrigerator
+
|Add dust cover to south side of freestanding member storage
| talk to dustin for direction
+
|
|  
+
|
| &nbsp;???
+
|
 
|-
 
|-
| pull down drum from metal dust collector in metal shop
+
|Move SandBlast Station and supplies to East Wall between Welding Zone and Overhead Door
| assess if machine is in functioning order
+
|
|  
+
|Jim Kemp
|  
+
|$0
 
|-
 
|-
| Mount Sorensen PSU under e-lab shelf
+
[[Category:Organization Information]][[Category:Reference Data]]
|
+
| Nate or Joe
+
|
+
|}
+

Revision as of 15:13, 20 November 2012

Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions? contact Dustin White dustinbikes@gmail.com)

Need supplies? Toss 'em on the ShoppingList and maybe somebody will check that page from their phone next time they're at the store.


Task Next Action Volunteer? Approx Cost of materials
Clean and sweep under graveyard area
Rearrange phone buttons so they're accurately labeled This is a firmware change, I just need to figure out which one it is. Nate W $0
Make "how to transfer calls, etc" cheatsheet for each phone Figure that out! $0
make vinyl "propaganda signs" sayings about keeping the place clean and such
make stencil on lasercutter sayings "SWEEP If you can't read this" spraypaint on woodshop floor
install seals around garage door
mount dust collector switches Second switch needs ran next to the chopsaw! Greg installed magnet on Saw switch may be ok G donated Magnet
sweep and vaccum
get audio system up and running run wire from speakers back to backboard <- Whats this mean, who do I ask? terminal strips already in e-room bin
mount and wire security cameras
install automatic drain on air compressor
organize above window lumber storage areas
organize scrap lumber under chop saw
Chain link fence cage for dust collector
add Cowl to furnaces aim into metal shop, aim at west side of shop.
Forklift repair Repair ignition switch
Replace twitterbot camera
purge graveyard
manage scrap metal near welding
cyclone fence around kilm Terry W
assemble last set of orange shelves the ends arnt the same, either welding together or drilling and bolting Nate W
find home for injection molders  ?? - current home u no like?
find new home for paint
cleanup and revamp hardware land
fix sandblasters
build shelf on sw metal shop wall for storage of materials
rubber shroud for dust collector
have nick take home lights, juki, and jointer
go through wood stock and dispose of unusable
build a workbench area for laser cutter
build 3 lockable money boxes one done 2 to go Greg Smith 12.82
build tool holder for vinyl area
find a solution to have am aux jack at commons table for audio
organize cleaning cabinet
setup scanner/copier/blog station
return little busted ass laser to AHA
build cart for large power supplies
clean the hell out of craft room
move rack into kitchen for extra pop
clean kitchen and mop floor
buy 3 drawer thingy for kitchen buy untensils and bowls for kitchen from dollar tree
hang shop light over table saw buy shop light for two 4ft T8 bulbs $20
mount pegboard box on NW user storage end cap box is clamped in place, needs permanent fastening $0, supplies on hand
Build wood shop machine cart
Install Casters on Wood Shop router table Admire how nice it is Greg Smith
Move Drill Press to Wood Shop
Make "I don't know where this goes" boxes for each main area
Add dust cover to south side of freestanding member storage
Move SandBlast Station and supplies to East Wall between Welding Zone and Overhead Door Jim Kemp $0