Difference between revisions of "ToDo"

From i3Detroit
Jump to: navigation, search
(47 intermediate revisions by 10 users not shown)
Line 1: Line 1:
NEW TASKS, as of October 2011
+
Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions?  contact Dustin White dustinbikes@gmail.com)
 +
 
 +
Need supplies? Toss 'em on the [[ShoppingList]] and maybe somebody will check that page from their phone next time they're at the store.
  
All this planning got you hungry? Head on over to the [[Potlock Menu Planning|Foodie Page]] to get your feast planning on. Volunteer to bring your favorite dishes and show off your amazing culinary skills!
 
  
 
{| cellspacing="1" cellpadding="1" border="1"
 
{| cellspacing="1" cellpadding="1" border="1"
Line 7: Line 8:
 
! Task  
 
! Task  
 
! Next Action  
 
! Next Action  
! Volunteer?
+
! Volunteer?  
 
! Approx Cost of materials
 
! Approx Cost of materials
 
|-
 
|-
| Replace light fixture just inside the main door
+
| Clean and sweep under graveyard area
| procure cheapie 2-tube fixture
+
|
+
| $20?
+
|-
+
| Buy more T-8 bulbs
+
| 10+ pack?
+
|
+
| $20?
+
|-
+
| Move light switches near door
+
| Install switches by main entrance to control all overhead lights. - Leave shop separate.
+
 
|
 
|
| ??
 
|-
 
| Clean crud out of washtub!
 
| EWWWW :(
 
 
|
 
|
 
|
 
|
 
|-
 
|-
| Vinyl propaganda signs
+
| Rearrange phone buttons so they're accurately labeled
| Come up with sayings "Sweep around machines, Hitler would"
+
| This is a firmware change, I just need to figure out which one it is.
| Nate W/Vinyl Team
+
| Nate W
 
| $0
 
| $0
 
|-
 
|-
| Redo drip pan above server rack before it turns into a waterfall.
+
| Make "how to transfer calls, etc" cheatsheet for each phone
| Install drain tube down to washtub
+
| Figure that out!
 
|  
 
|  
| $10-20?
+
| $0
 
|-
 
|-
| Install shelving in Power wheels area, re-purpose benches.
+
|make vinyl "propaganda signs"
| Find more 12-14' pallet racking
+
|sayings about keeping the place clean and such
| nate w / rocco / anyone!
+
|
| ???
+
|
 
|-
 
|-
| Garage-door concrete
+
|make stencil on lasercutter
| Raise concrete level below door higher than outside.
+
|sayings "SWEEP If you can't read this" spraypaint on woodshop floor
| Nate W
+
|
| $4
+
|
 
|-
 
|-
|''' PRIOR TASKS THAT STILL NEED DONE!!'''
+
|install seals around garage door
|  
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| Replace ceiling fan by parts area
+
|mount dust collector switches
| note: new fan is on black freezer
+
| Second switch needs ran next to the chopsaw!
| DONE?
+
| Greg installed magnet on Saw switch may be ok
 +
| G donated Magnet
 +
|-
 +
|sweep and vaccum
 +
|
 +
|
 
|
 
|
 
|-
 
|-
| Update MSDS binder by door
+
|get audio system up and running
|  
+
|run wire from speakers back to backboard <- Whats this mean, who do I ask?
|  
+
|
|  
+
|terminal strips already in e-room bin
 
|-
 
|-
| Affix laser-cutter inner lights with Dual-Lock strips
+
|mount and wire security cameras
| Get high off 3m adhesive primer
+
|
| Anyone? See Nate B
+
|
| $0
+
|
 
|-
 
|-
| Construct shop-vac accessories rack
+
|install automatic drain on air compressor
| Gather all nozzles and design rack
+
|
|  
+
|
 
|
 
|
|-
 
| Clear Genie-width path to member storage
 
|
 
|
 
|$0
 
 
|-
 
|-
| remove MDF table/counters from wood shop
+
|organize above window lumber storage areas
| ask Nick to take home/remove
+
|
 +
|
 
|
 
|
|$0
 
 
|-
 
|-
| Mount monitor on/near rack, for admin KVM usage
+
|organize scrap lumber under chop saw
 +
|
 +
|
 
|
 
|
|
 
| $0
 
 
|-
 
|-
| Consolidate adhesives/solvents/cleaners/etc and label <br>each&nbsp;location&nbsp;with pointers to the other
+
|Chain link fence cage for dust collector
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
| Cover roof openings, consider snow-melt drainage in your design
+
|add Cowl to furnaces
 +
|aim into metal shop, aim at west side of shop.
 +
|
 
|
 
|
|
 
| $0
 
 
|-
 
|-
| Winterization stuff (Bill putt suggested -- need more specifics)
+
|Forklift repair
|  
+
|Repair ignition switch
 +
|
 
|
 
|
| $0
 
 
|-
 
|-
| add dividers to member storage shelves
+
|Replace twitterbot camera
| use tape or paint to divide the shelves into quarters
+
|
 +
|
 
|
 
|
|
 
 
|-
 
|-
| clean up FIRST area
+
|purge graveyard
| throw away junk and put all gear into bins below benches
+
|
 +
|
 
|
 
|
| $0
 
 
|-
 
|-
| sweep and vacuum your butt off
+
|manage scrap metal near welding
|  
+
|
| everyone!
+
|
|$0
+
|
 
|-
 
|-
| identify emergency exit routes and paint the lines
+
|cyclone fence around kilm
| we have floor marking paint, (update:picked up skinny rollers)
+
|
|  
+
|Terry W
| $0
+
|
 
|-
 
|-
| finish up audio system
+
|assemble last set of orange shelves
| mount amplifiers in rack, mount speakers, run wire
+
|the ends arnt the same, either welding together or drilling and bolting
|  
+
|Nate W
|$0
+
|
 
|-
 
|-
| mount and wire security cameras
+
|find home for injection molders
| talk to Joe B or Nate B about camera mount locations
+
| ?? - current home u no like?
|  
+
|
|?
+
|
 
|-
 
|-
| Make boxes to store assorted tools in tool area
+
|find new home for paint
| identify tools which need boxes
+
|
|  
+
|
|$0
+
|
 
|-
 
|-
| remove desk from whiteboard room
+
|cleanup and revamp hardware land
|  
+
|
|  
+
|
|$0
+
|
 
|-
 
|-
| organize fastener area
+
|fix sandblasters
| organize and label fasteners
+
|
|  
+
|
|$0
+
|
 
|-
 
|-
| build table for little sanblaster
+
|build shelf on sw metal shop wall for storage of materials
| talk to dustin about getting the sandblaster set up
+
|
|  
+
|
|$9
+
|
 
|-
 
|-
| Reroute all e-room bench equipment power cords to go behind shelf<br> (empty shelf, rip half an inch off its depth, remount it, reload it)
+
|rubber shroud for dust collector
|  
+
|
 +
|
 
|
 
|
|$0
 
 
|-
 
|-
| Label all E-room gear power cords (Many already done, follow example)
+
|have nick take home lights, juki, and jointer
|  
+
|
 +
|
 
|
 
|
| $0
 
 
|-
 
|-
| Repair / upgrade selected 115V circuits
+
|go through wood stock and dispose of unusable
| Documentation: [[Breaker Panels]], [[Theater Lights]]
+
|
| Dave S
+
|
|???
+
|
 
|-
 
|-
| seal off end of member storage shelves so that equipment can be butted against it
+
|build a workbench area for laser cutter
|  
+
|
 +
|
 
|
 
|
| $48
 
 
|-
 
|-
| allocate two of the steel drums for aluminum and steel scrap
+
|build 3 lockable money boxes
| put vinyl signage on drums
+
| one done 2 to go
|  
+
| Greg Smith
|$0
+
| 12.82
 
|-
 
|-
| store unused dust collector manifold and filters in loft
+
|build tool holder for vinyl area
| put filters in garbage bags
+
|
|  
+
|
|$0
+
|
 
|-
 
|-
| move 5sl printer away from print shop over to server area.
+
|find a solution to have am aux jack at commons table for audio
|  
+
|
|  
+
|
|$0
+
|
 
|-
 
|-
| organize vinyl cutter area.
+
|organize cleaning cabinet
|  
+
|
|  
+
|
 +
|
 
|-
 
|-
 +
|setup scanner/copier/blog station
 +
|
 +
|
 +
|
 
|-
 
|-
| level rough concrete
+
|return little busted ass laser to AHA
|  
+
|
|  
+
|
|$8
+
|
 
|-
 
|-
| make signage to identify circuit breakers
+
|build cart for large power supplies
|  
+
|
|  
+
|
|$0
+
|
 
|-
 
|-
| make a cart for folding chairs
+
|clean the hell out of craft room
 +
|
 +
|
 
|
 
|
|
 
| ???
 
 
|-
 
|-
| replace vents in office area
+
|move rack into kitchen for extra pop
|  
+
|
 +
|
 
|
 
|
|???
 
 
|-
 
|-
| cut vent in electronics room and install vent cover
+
|clean kitchen and mop floor
| there is a vent in wall that has been drywalled over
+
|
|  
+
|
|???
+
|
 
|-
 
|-
| install cisco network gear into rack
+
|buy 3 drawer thingy for kitchen
| rocco will be bringing in a rack for this purpose
+
|buy untensils and bowls for kitchen from dollar tree
| rocco
+
|
|$0
+
|
 
|-
 
|-
| clean up kitchen and throw out old stock of goods
+
|hang shop light over table saw
|  
+
|buy shop light for two 4ft T8 bulbs
|  
+
|
|$0
+
|$20
 
|-
 
|-
| install small shelf to place microwave in cabinet
+
|mount pegboard box on NW user storage end cap
| talk to dustin for direction
+
|box is clamped in place, needs permanent fastening
 
|
 
|
| $0
+
|$0, supplies on hand
 
|-
 
|-
| talk to Bob B about painting fridge (brown one)
+
|Build wood shop machine cart
|  
+
|
|  
+
|
|$0
+
|
 
|-
 
|-
| make soda can dispensers for white refrigerator
+
|Install Casters on Wood Shop router table
| talk to dustin for direction
+
|Admire how nice it is
 +
|Greg Smith
 
|
 
|
| ???
 
 
|-
 
|-
| pull down drum from metal dust collector in metal shop
+
|Move Drill Press to Wood Shop
| assess if machine is in functioning order
+
|
 +
|
 
|
 
|
|
 
 
|-
 
|-
| Mount Sorensen PSU under e-lab shelf
+
|Make "I don't know where this goes" boxes for each main area
 
|
 
|
| Nate or Joe
 
 
|
 
|
|}
+
|
 +
|-
 +
|Add dust cover to south side of freestanding member storage
 +
|
 +
|
 +
|
 +
|-
 +
|Move SandBlast Station and supplies to East Wall between Welding Zone and Overhead Door
 +
|
 +
|Jim Kemp
 +
|$0
 +
|-
 +
[[Category:Organization Information]][[Category:Reference Data]]

Revision as of 15:13, 20 November 2012

Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions? contact Dustin White dustinbikes@gmail.com)

Need supplies? Toss 'em on the ShoppingList and maybe somebody will check that page from their phone next time they're at the store.


Task Next Action Volunteer? Approx Cost of materials
Clean and sweep under graveyard area
Rearrange phone buttons so they're accurately labeled This is a firmware change, I just need to figure out which one it is. Nate W $0
Make "how to transfer calls, etc" cheatsheet for each phone Figure that out! $0
make vinyl "propaganda signs" sayings about keeping the place clean and such
make stencil on lasercutter sayings "SWEEP If you can't read this" spraypaint on woodshop floor
install seals around garage door
mount dust collector switches Second switch needs ran next to the chopsaw! Greg installed magnet on Saw switch may be ok G donated Magnet
sweep and vaccum
get audio system up and running run wire from speakers back to backboard <- Whats this mean, who do I ask? terminal strips already in e-room bin
mount and wire security cameras
install automatic drain on air compressor
organize above window lumber storage areas
organize scrap lumber under chop saw
Chain link fence cage for dust collector
add Cowl to furnaces aim into metal shop, aim at west side of shop.
Forklift repair Repair ignition switch
Replace twitterbot camera
purge graveyard
manage scrap metal near welding
cyclone fence around kilm Terry W
assemble last set of orange shelves the ends arnt the same, either welding together or drilling and bolting Nate W
find home for injection molders  ?? - current home u no like?
find new home for paint
cleanup and revamp hardware land
fix sandblasters
build shelf on sw metal shop wall for storage of materials
rubber shroud for dust collector
have nick take home lights, juki, and jointer
go through wood stock and dispose of unusable
build a workbench area for laser cutter
build 3 lockable money boxes one done 2 to go Greg Smith 12.82
build tool holder for vinyl area
find a solution to have am aux jack at commons table for audio
organize cleaning cabinet
setup scanner/copier/blog station
return little busted ass laser to AHA
build cart for large power supplies
clean the hell out of craft room
move rack into kitchen for extra pop
clean kitchen and mop floor
buy 3 drawer thingy for kitchen buy untensils and bowls for kitchen from dollar tree
hang shop light over table saw buy shop light for two 4ft T8 bulbs $20
mount pegboard box on NW user storage end cap box is clamped in place, needs permanent fastening $0, supplies on hand
Build wood shop machine cart
Install Casters on Wood Shop router table Admire how nice it is Greg Smith
Move Drill Press to Wood Shop
Make "I don't know where this goes" boxes for each main area
Add dust cover to south side of freestanding member storage
Move SandBlast Station and supplies to East Wall between Welding Zone and Overhead Door Jim Kemp $0