Torqcut Start-up procedure

From i3Detroit
Revision as of 09:37, 16 November 2011 by Amajorov (Talk | contribs)

Jump to: navigation, search

Bridgeport CNC Mill

Starting point for information related to the Bridgeport Torq-Cut 22 CNC milling machine. Very much a work in progress.

Start-up procedure

  • Power up CNC mill with power switch on back panel. Clockwise is "on", counterclockwise is "off".
Power Switch

  • Start air compressor
  • Open air valve at CNC
  • Lift red air valve on CNC

Loading Program from USB stick

  • Insert USB stick in reader at back of mill behind spring-loaded door