Difference between revisions of "Torqcut Start-up procedure"

From i3Detroit
Jump to: navigation, search
Line 4: Line 4:
  
 
==Start-up procedure==
 
==Start-up procedure==
*Power up CNC mill with power switch on back panel.
+
*Power up CNC mill with power switch on back panel. Clockwise is "on", counterclockwise is "off".[[file:powerswitch.jpg|thumb|300px|Power Switch]]
[[file:powerswitch.jpg|thumb|300px|Power Switch]]
+
 
*Start air compressor
 
*Start air compressor
 
*Open air valve at CNC
 
*Open air valve at CNC

Revision as of 08:47, 16 November 2011

Bridgeport CNC Mill

Starting point for information related to the Bridgeport Torq-Cut 22 CNC milling machine. Very much a work in progress.

Start-up procedure

  • Power up CNC mill with power switch on back panel. Clockwise is "on", counterclockwise is "off".
    Power Switch
  • Start air compressor
  • Open air valve at CNC
  • Lift red air valve on CNC

Loading Program from USB stick

  • Insert USB stick in reader at back of mill behind spring-loaded door