'''Office Panel on South Wall of Shop Area'''<br>
+
'''Office Subpanel on South Wall of Shop Area'''<br>
 +
(Service from 100A breaker above main disconnect, next to water heater)<br>
 
(Federal Pacific, use NA-NI or NC-NI breakers)
 
(Federal Pacific, use NA-NI or NC-NI breakers)
  
Line 14: Line 15:
 
| 15
 
| 15
 
| Office plugs middle
 
| Office plugs middle
|  
+
| Sheathed cable into joist above office
 
|-
 
|-
 
| 1b
 
| 1b
Line 20: Line 21:
 
| 20
 
| 20
 
| Office plugs east
 
| Office plugs east
|  
+
| Sheathed cable into joist above office
 
|-  
 
|-  
 
| 2
 
| 2
 
| N/A
 
| N/A
 
| 20
 
| 20
| Plug on beam north
+
| Tree House
|  
+
| Through pipe in floor
 
|-  
 
|-  
 
| 3
 
| 3
Line 32: Line 33:
 
| 15
 
| 15
 
| Office lights and emergency exit
 
| Office lights and emergency exit
|  
+
| Sheathed cable into joist above office
 
|-
 
|-
 
| 4
 
| 4
 
| N/A
 
| N/A
 
| 20
 
| 20
| Plug on beam north
+
| Tree House
|  
+
| Through pipe in floor
 
|-
 
|-
 
| 5
 
| 5
Line 44: Line 45:
 
| 15
 
| 15
 
| Office lights middle
 
| Office lights middle
|
+
| Sheathed cable into joist above office
 
|-
 
|-
 
| 6,8
 
| 6,8
Line 50: Line 51:
 
| 20
 
| 20
 
| Bathroom office heat/fan
 
| Bathroom office heat/fan
|  
+
| Sheathed cable into joist above office
 
|-
 
|-
 
| 7
 
| 7
Line 56: Line 57:
 
| 15
 
| 15
 
| Shop lights
 
| Shop lights
|
+
| One of two switches left of breaker panel, to junction box next to SE furnace
 
|-
 
|-
 
| 9
 
| 9
Line 62: Line 63:
 
| 15
 
| 15
 
| Shop lights middle
 
| Shop lights middle
|
+
| Lower switch left of breaker panel, to east ceiling junction box
 
|-
 
|-
 
| 10
 
| 10
Line 68: Line 69:
 
| 20
 
| 20
 
| Office lights and plugs
 
| Office lights and plugs
| Lights overhead door emergency exit
+
| Lights overhead door emergency exit (into office wall left of breaker panel)
 
|-
 
|-
 
| 11
 
| 11
Line 74: Line 75:
 
| 15
 
| 15
 
| Shop lights east
 
| Shop lights east
|  
+
| One of two switches left of breaker panel, to junction box next to SE furnace
 
|-
 
|-
 
| 12
 
| 12
Line 80: Line 81:
 
| 20
 
| 20
 
| Shop plugs east wall
 
| Shop plugs east wall
|  
+
| Through pipe in floor, power for IT components over front door
 
|-
 
|-
 
| 13
 
| 13
Line 86: Line 87:
 
| 15
 
| 15
 
| Leave Off
 
| Leave Off
| Amusingly, as of 2011-06-07, this breaker is switched on
+
| To junction box next to SE furnace (switched on as of 2011-06-07)
 
|-
 
|-
| 14,16
+
| 14
| N/A
+
| 16
 
| 40
 
| 40
 
| Rooftop AC and heat
 
| Rooftop AC and heat
|  
+
| To east loft, including roof
 
|-
 
|-
 
| 15
 
| 15
Line 98: Line 99:
 
| 15
 
| 15
 
| Heater south
 
| Heater south
| As of 2011-06-07, this breaker is switched off
+
| To east ceiling junction box (switched off as of 2011-06-07)
 
|-
 
|-
 
| 17
 
| 17
Line 104: Line 105:
 
| 15
 
| 15
 
|  
 
|  
|  
+
| To east ceiling junction box
 
|-
 
|-
| 18,20
+
| 18
| N/A
+
| 20
 
| 40
 
| 40
 
|  
 
|  
|  
+
| To east loft, including roof
 
|-
 
|-
 
| 19
 
| 19
Line 116: Line 117:
 
| 15
 
| 15
 
| Leave Off
 
| Leave Off
| As of 2011-06-07, this breaker is switched off
+
| To junction box next to SE furnace (switched off as of 2011-06-07)
 
|-
 
|-
 
| 21a
 
| 21a
Line 122: Line 123:
 
| 15
 
| 15
 
| Heater overhead door
 
| Heater overhead door
|  
+
| To east ceiling junction box
 
|-
 
|-
 
| 21b
 
| 21b
Line 128: Line 129:
 
| 20
 
| 20
 
| Office plugs east
 
| Office plugs east
|  
+
| To west loft (upper pipe)
 
|-
 
|-
 
| 22a
 
| 22a
 
| N/A
 
| N/A
 
| 15
 
| 15
| Plug left of panel
+
| Outlet left of breaker panel
|  
+
| IT server rack power
 
|-
 
|-
 
| 22b
 
| 22b
Line 140: Line 141:
 
| 20
 
| 20
 
|  
 
|  
|  
+
| To east loft, including roof
 
|-
 
|-
 
| 23a
 
| 23a
Line 146: Line 147:
 
| 20
 
| 20
 
|  
 
|  
|  
+
| To west loft (upper pipe)
 
|-
 
|-
 
| 23b
 
| 23b
Line 152: Line 153:
 
| 20
 
| 20
 
|  
 
|  
|  
+
| To east ceiling junction box
 
|-
 
|-
 
| 24
 
| 24
Line 158: Line 159:
 
| 20
 
| 20
 
| Office lights and plugs
 
| Office lights and plugs
|  
+
| To west loft (lower pipe)
 
|}
 
|}
  

Revision as of 18:24, 17 June 2011

Office Subpanel on South Wall of Shop Area
(Service from 100A breaker above main disconnect, next to water heater)
(Federal Pacific, use NA-NI or NC-NI breakers)

Location Second Pole Amperes Description Notes
1a N/A 15 Office plugs middle Sheathed cable into joist above office
1b N/A 20 Office plugs east Sheathed cable into joist above office
2 N/A 20 Tree House Through pipe in floor
3 N/A 15 Office lights and emergency exit Sheathed cable into joist above office
4 N/A 20 Tree House Through pipe in floor
5 N/A 15 Office lights middle Sheathed cable into joist above office
6,8 N/A 20 Bathroom office heat/fan Sheathed cable into joist above office
7 N/A 15 Shop lights One of two switches left of breaker panel, to junction box next to SE furnace
9 N/A 15 Shop lights middle Lower switch left of breaker panel, to east ceiling junction box
10 N/A 20 Office lights and plugs Lights overhead door emergency exit (into office wall left of breaker panel)
11 N/A 15 Shop lights east One of two switches left of breaker panel, to junction box next to SE furnace
12 N/A 20 Shop plugs east wall Through pipe in floor, power for IT components over front door
13 N/A 15 Leave Off To junction box next to SE furnace (switched on as of 2011-06-07)
14 16 40 Rooftop AC and heat To east loft, including roof
15 N/A 15 Heater south To east ceiling junction box (switched off as of 2011-06-07)
17 N/A 15 To east ceiling junction box
18 20 40 To east loft, including roof
19 N/A 15 Leave Off To junction box next to SE furnace (switched off as of 2011-06-07)
21a N/A 15 Heater overhead door To east ceiling junction box
21b N/A 20 Office plugs east To west loft (upper pipe)
22a N/A 15 Outlet left of breaker panel IT server rack power
22b N/A 20 To east loft, including roof
23a N/A 20 To west loft (upper pipe)
23b N/A 20 To east ceiling junction box
24 N/A 20 Office lights and plugs To west loft (lower pipe)


Panel in SW Corner of Shop Area
(Pushmatic Electri-Center)

Location Second Pole Amperes Description Notes
1 2 100 Main
3 N/A 20 Water cooler plug
4 N/A 20 Shop fans (leave on so pipes don't freeze)
5 N/A 15 Rear shop lights
6 N/A 20 West shop lights
7 N/A 20 Emergency lights, night lights
8 N/A 20 West shop lights
9a N/A 20 Plug on wall shop by water cooler
10 N/A 20 West shop lights
11 N/A N/A Spare No breaker installed
12 N/A N/A Spare No breaker installed
13 14 60 Subpanel in rear shop


Subpanel in NW Corner of Shop Area
(Resembles Pushmatic Electri-Center)

Location Second Pole Amperes Description Notes
1 N/A N/A Spare No breaker installed
2 N/A N/A Spare No breaker installed
3 N/A 20 Plugs on west wall
4 N/A 20 Plugs on north wall
5a N/A 20 Plugs on west wall
5b N/A 20 Plugs on east wall
6 N/A 20 Plugs on west wall
7 N/A 20
8a N/A 20 Lights in NE rear
8b N/A 20 Plugs on NE wall
9 10 20 Roof exhaust fans
11 N/A 20 Roof exhaust next to beam
12 N/A 20 Plugs north by door NE